How are double labels prevented during a standby changeover?
The controls must assign each physical pack to one authorised application job and confirm the state of packs around the handover point. The inactive station should not act on stale or duplicate triggers. Prove that sequence with labelled, unlabelled and deliberately rejected packs rather than relying on both printers being ready.